Category: Projects

Campbell’s Store Redevelopment – The Rocks
Campbell’s Store, located at the Rocks, is a historical site which is being restored to attract visitors. Situated on the Harbor, Campbell’s Store will transform into a shopping precinct with restaurants, cafes and bars. Axis Services will complete the Hydraulic Services for all levels of the Campbell’s Store, with the expected completion date of the overall project being in 2018.
Scope of Work:
- Sanitary Service
- Storm Water Service
- Hot and Cold-Water Service
- Natural Gas Service
- Trade Waste Service
- Hose Reel Service

Aveo Gasworks
Aveo is an aged facility consisting of
- 99 bed fully assisted aged care over 2 levels
- Commercial office tenancy
- 49 assisted living apartments over 3 levels
- 142 independent living apartments over 9 levels.
Scope of Work:
- Hydraulic Services

West Connex M4 East
The M4 Motorway, connecting the Western Suburbs to the surrounding city suburbs, is currently underway, extending the tunnels between Homebush, Concord and Haberfield. The extension will create more space on the motorway and make travel more efficient for those who have previously used this motorway, as well as for those who continue to use it. With 6.5km of underground and above ground work, the project is expected to reach completion in 2020.
Scope of Work:
- Sanitary Service
- Storm Water Service
- Hot and Cold-Water Service
- Fire Hydrant Service
- Trade Waste Service
- Hose Reel Service

Adina Hotel
The Adina apartment Hotel is a refurbishment of an old existing heritage listed building. previously a bank : in the heart of Brisbane city.
This project entailed a full refurbishment of the existing 10 levels and an addition of another 4 new levels to total 220 studio and apartment rooms, Indoor Pool, Gymnasium. Restaurants and Bars.
Scope of Work:
- Hydraulic Services

Inpex, Ichthys Onshore LNG Facilities Project – TMP-1 (D&C)
Axis Plumbing NT on behalf of Leighton Contractors undertook the Design and construct of the TMP-1 Project.
This included:
Sewer Rising Mains:
Supply & installation of big bore HDPE throughout the site with 14 Pump Stations connecting to the WWTP.
Sewer Outfall:
Supply & installation of 160mm HDPE PN20 in ground from the WWTP. Once it reaches the shoreline the pipe work is supported on specially design concrete anchor blokes to cater for the climate. This then dischargers into the Harbour (600mtrs offshore) through specially designed diffuser system.
Domestic water:
Supply & installation of small to big bore HDPE throughout the site. All relevant valves, tanks with Altitude valves, Containerized UV & VSD pumps.
Fire Service.
Supply & installation of big bore HDPE PN20 throughout the Contractors area & the warehouse. Including Hydrants & FHR, Fire storage tanks, and Containerized Electric/Diesel fire pumps.
Sanitary Sewer:
Supply & installation of sanitary stacks to all ablution/contractors areas around site.

Single Leap II RMC & ADFA ACT Defence Housing Project
Axis Plumbing on Behalf of Watpac undertook the hydraulic services on the Single leap II defence housing project, the project consisted of 7 precinct Buildings on ADFA consisting of 80 Units and 33 Units over 2 precinct Buildings
Key Hydraulic Components on Single Leap II:
- Design & Construct contract
- IEW Infrastructure upgrade works.
- Solar Heating
- Fire Supply
- Rainwater Re-use

HMAS Harman Mechanical piping
Axis Plumbing on Behalf of fredon Air pty ltd undertook mechanical piping works on the HMAS Harman project ACT . The mechanical piping of these works included, New Plant room, Data Hall cooling , chilled water storage tank pipework
The project was completed in a very short time frame with regards to the amount and size of services installed. The overall duration just under 9 months in which time Axis installed in excess of 3.5 kilometres of pipe ranging in size from 15mm diameter up to 350mm diameter and peaking at a total labour force of 55 men. The project was unconventional in its sequencing which placed pressure on time frames and meant that prefabrication was pivotal to the delivery and success of the installation.
Key Mechanical components on HMAS Harman Mechanical Pipe-wok projectt:
- Chilled pipe work
- Heating water pipework
- Large Bore spiral copper installation

ADFA redevelopment Mechanical piping
Axis Plumbing on Behalf of Climatech pty ltd are undertaking mechanical piping works on the redevelopment project on the ADFA defence campus ACT . The mechanical piping of these works include, Plant room upgrade, replace existing pipe work , new equipment connections
Key Mechanical components on ADFA redevelopment:
- Chilled pipe work
- Side stream filtration piping
- Condensing water pipework
- Heating water pipework
- Refrigeration piping

121 Marcus Clarke Commercial Building ACT
Axis Plumbing on Behalf of Baulderstone undertook the hydraulic services on 121 mcs commercial building , The project consisted of 12 storey office space , 4 level underground car park
Key Hydraulic Components on 121 MCS project:
- Design & Construct contract
- Rainwater harvesting
- Syphonic Design and construct component

4 National Ct Barton ACT
Axis Plumbing on Behalf of lend lease undertook the hydraulic services on the 4 National ct Barton project , The project consisted of two 6 storey office spaces , 4 level underground car parks, and plant rooms .
Key Hydraulic Components on 4 national ct Barton:
- Civil Stormwater Works : Detention Tanks ,Perimeter civil stormwater and Gross pollution traps
- Rainwater Harvest : Syfonic system harvesting roof rainwater to collection tank consisting of 100,000ltr Stainless Steel panel
Project Tenancy’s:
- Austrac
- ADG Fit Out
- Creche

Karratha Health Campus
Axis WA on behalf of Multiplex Construction undertook the completion of the Hydraulic and Fire services.

Curtin University Student Accommodation
Axis WA on behalf of Probuild Construction undertook the completion of the Hydraulic Services to Curtin University Student Accommodation in Perth West Australia.

Forrestfield Airport Link
Axis WA on behalf of Salini Impregilo S.P.A & NRW Pty Ltd undertook the Airport link train stations in providing the Hydraulic and Fire Services.

Next DC Date Centre – East Perth
Axis WA on behalf of Multiplex Construction undertook the Hydraulic, Civil & Mechanical Services at Next DC Date Centre at 11 Newcastle St, Perth WA.

Edith Cowan University
Axis WA on behalf of Multiplex Constructions undertook the completion of the Hydraulic & Medical Gas services.

Narrogin Health Service
Axis WA on behalf of Cockram Construction undertook the completion of Hydraulic Services refurbishment and new buildings.

King Square – Fremantle
Axis WA on behalf of Probuild Construction provides Hydraulic services for King Square – Fremantle Office Building and Food Tenancies.

University of West Australia
Axis WA on behalf of Fredon Air Construction undertook the completion of the Mechanical Services – Pipe installation on this project.

Raine Square
Axis WA on behalf of Probuild Constructions and MPM Williams Joint Venture undertook the Hydraulic Services and Mechanical Piping on the Raine Square office tower, retail precinct and heritage listed buildings.

Fiona Stanley Hospital
Axis WA on behalf of Brookfield Multiplex undertook a wide range of services on the new Fiona Stanley Hospital. These services include Hydraulic, Mechanical Piping and Medical Gas Piping to various buildings, including the following:
Building A – Educational Teaching Block
Building B – Main Hospital
Building D – Mental Health Building
Building E – Administration
Building R – Mental Health
Building Y – Central Energy Plant
WA Institute of Medical Research Building

Enex 100 (100 St Georges Terrace)
Axis WA on behalf of Desair Hastie Joint Venture undertook the Mechancial Pipework package which included but not limited to chilled, heating and condenser water on the office tower and retail precinct at 100 St Georges Terrace; affectionately known as Enex 100.

Currie Hall – University of WA Student Accommodation
Axis WA on behalf of Probuild Constructions undertook the completion of the Hydraulic Services to Building B and C on the new Currie Hall student accommodation buildings.
The timeframe coupled with taking over the project from a previous contractor made the project slightly more challenging than normal.

Carousel Shopping Centre
Axis WA on behalf of BurkeAir undertook the Mechanical Pipework for the chiller and pipework upgrade to the prestigious Westfield Carousel Shopping Centre, this being the first commercial property in WA to have chillers in series.
A tight time frame of four months to complete all works, with at peak, 29 employees on the project and it was finished 3 weeks ahead of programme.

Wiri Prison
Axis Plumbing NZ, on behalf of Aquaheat undertook the HVAC piping and Gas services at Wiri Prison. With 25 buildings across the 17Ha site, this site posed a unique set of challenges.
The site wide gas reticulation was completed in PE pipe and electro fusion couplers and totalled over 3km. The HVAC system comprises of a chilled water central plant with an in ground Insa Pipe PPR reticulation feeding the health, Admin and reception buildings and a localised Heating water plant room in each building requiring heating. This project was a GMP and held significant risk in terms of partially complete drawing and design at time of tender. This job has progressed well with our site team even winning an award for outstanding commitment to safety.

Britomart East 1 and 2
Axis Plumbing NZ, on behalf of Hastie NZ undertook the HVAC piping services of the East 1 & 2 buildings.
The two building are joined at each end with a large full height atrium to accommodate the Britomart central train station below. Constructed using Copper, Mild and Stainless Steel to base build levels and then altered as per tenant specifications. The most challenging aspect of this project was the amalgamation of the initially planned two separate plant rooms into one large plant room operating independently of each other to serve each building.

ANZ Tower
Axis Plumbing NZ, on behalf of Airpro, undertook the HVAC piping services at ANZ tower.
This 42 story tower building was partially tenanted throughout the construction and had staged handovers to relocating tenants. The most challenging aspect of this project was the staged upgrade of the plant and risers, including roof top cooling towers in 400mm Stainless steel while keeping the building operational around the tenants. Towards the end of this project Airpro went into liquidation and Axis Plumbing NZ were engaged directly by Fletcher interiors to complete the project. Axis Plumbing NZ completed our contract works on schedule.

73 Remuera Road
Axis Plumbing NZ, on behalf of McAlpine Hussman undertook the HVAC piping services of the 73 Remuera road.
This was a Manson Property development this is the third such development which Axis Plumbing NZ have completed for this client in conjunction with McAlpine Hussman. Primarily a mixed use office and retail space utilising an air cooled heat recovery chiller this project was completed using Steel and PPR.

21 Queen Street
Axis Plumbing NZ, on behalf of Numecon undertook the HVAC piping services of 21 Queen Street.
The focus of this project was to upgrade the existing 12 floors and another 6 floors of office space. Constructed using mild and Stainless Steel, and PPR floor run outs to chilled beams on each floor . This project was completed over 12 months and was one of New Zealand’s first 5 star greenstar buildings.

Melbourne Connect
Project Description
Melbourne’s new innovation precinct, Melbourne Connect, is set to drive social and economic transformation, and create a progressive future for the University of Melbourne, its students and broader community.
Delivering a dynamic blend of uses – Melbourne School of Engineering, student accommodation, lab/research space, commercial, childcare, and a flagship Science Gallery – Melbourne Connect will create a vibrant hub where staff, students, researchers, businesses and start-up companies will come together to tackle major societal challenges, such as food security, changing technologies and urbanisation.
The precinct of 75,800m2 (GFA) is formed by three separate buildings, with the school of engineering and industry spaces connected by a ‘superfloor’ event and collaboration space above ground structure (with open space at its heart) and a precinct wide basement substructure.
Project Summary
- 40-50% estimated energy consumption and associated greenhouse gas emissions reductions
- 3 buildings (10, 5 and 13 storeys) united by the ‘superfloor’ structure
- 3,000 direct jobs including 2,500 job in commercial and scientific industries

Monash Hospital Emergency – Extension
Project Description
The Victorian Government has invested $76.3 million in the Monash Medical Centre emergency department expansion and traffic improvement project.
The redevelopment will also improve access for ambulances arriving at emergency, meaning patients will get the vital care they need faster, and address traffic and congestion concerns making it safer and more efficient.
The expansion will also create a dedicated kids-only emergency area. This area is designed to provide children with a private, calm and compassionate environment and to help meet increasing demand for pediatric emergency care.
An additional 24 emergency department beds and an extra 10 short-stay beds for patients who need extended observation and care will be added.
A new Alcohol and Other Drug and Mental Health Hub will include a separate 24-hour, short-stay unit to treat people with mental health or alcohol and other drug problems in times of urgent need. It is one of six hubs being delivered across the state.