Axis Plumbing NT on behalf of Leighton Contractors undertook the Design and construct of the TMP-1 Project.
This included:

Sewer Rising Mains:
Supply & installation of big bore HDPE throughout the site with 14 Pump Stations connecting to the WWTP.

Sewer Outfall:
Supply & installation of 160mm HDPE PN20 in ground from the WWTP. Once it reaches the shoreline the pipe work is supported on specially design concrete anchor blokes to cater for the climate. This then dischargers into the Harbour (600mtrs offshore) through specially designed diffuser system.

Domestic water:
Supply & installation of small to big bore HDPE throughout the site. All relevant valves, tanks with Altitude valves, Containerized UV & VSD pumps.

Fire Service.
Supply & installation of big bore HDPE PN20 throughout the Contractors area & the warehouse. Including Hydrants & FHR, Fire storage tanks, and Containerized Electric/Diesel fire pumps.

Sanitary Sewer:
Supply & installation of sanitary stacks to all ablution/contractors areas around site.