310 Anne St

310 Anne st project consisted of a full refurbishment of the existing18 levels of office space, with new amenities and future fitout capabilities for all levels.

FV Flatiron

FV Flatiron is residential icon in the heart of fortitude Valley Brisbane. The development includes a total of 651 units over 2 uniquely designed towers. Its facilities include 3 pools, cinema ,Gym Yoga studio, casual dining and bar areas.

Scope of Work:

  • Hydraulic Services

Aveo Gasworks

Aveo is an aged facility consisting of

  • 99 bed fully assisted aged care over 2 levels
  • Commercial office tenancy
  • 49 assisted living apartments over 3 levels
  • 142 independent living apartments over 9 levels.

Scope of Work:

  • Hydraulic Services

Adina Hotel

 

The Adina apartment Hotel is a refurbishment of an old existing heritage listed building. previously a bank : in the heart of Brisbane city.

This project entailed a full refurbishment of the existing 10 levels and an addition of another 4 new levels to total 220 studio and apartment rooms, Indoor Pool, Gymnasium. Restaurants and Bars.

Scope of Work:

  • Hydraulic Services

Westfield Carindale shopping centre

Westfield Carindale was a 2 stage major refurbishment and addition to the existing shopping centre which all took place over a period of 22 months. This consisted of the relocation of the major retailers, such as Woolworths, Coles Target and Kmart, as well as the Carindale Hotel, and an additional 110 retail tenancies, all situated in a brand new modern 5 star green star designed building.

Green Square North Tower

Green Square North Tower consisted of approximately 24,000 m2 of office space over 12 levels and 600m2 of retail space. Axis Plumbing Qld provided a 6 Star Green star Hydraulics Design and upon completion the building was acknowledge by the Green Council.

Gatton Prison

Axis Plumbing on Behalf of Baulderstone undertook the hydraulic services on the The Southern Queensland Correctional Precinct (Gatton SQCP) 300-bed prison, including two secure accommodation cell block units to accommodate the 104 high security prisoners, and nine residential accommodation blocks to accommodate the remaining 196 prisoners. 

Other buildings constructed within the secure centre include administration, kitchen, laundry, workshops, bulk store and medical centre. Located outside the perimeter of the correctional centre are a visitor processing building, staff amenities and training facility, dog squad building and a number of central facilities buildings for services such as energy and wastewater treatment. This was also to be the first correctional centre to implement sustainable practices across the design, construction and operational phases of the project.


ABC Brisbane Accommodation Project

ABC decided to amalgamate all of their separate offices locate all over Brisbane to the one new building designed to accommodate every facet of their organisation. 

This consisted of TV and Radio broadcasting, post production facilities, A full size orchestra rehearsal Hall, music practice studios and large open plan office space.

Axis Plumbing were responsible for a 6 Star Green star full design ,with a rainwater storage and re-use system to facilitate maximum water conservation.