Sydney Crown Casino

Project Overview:

Work in progress

Scope of Work:

  • Domestic Cold Water Supply
  • Domestic Hot Water Supply
  • Non-Potable Water Supply
  • Natural Gas
  • Sewerage Systems
  • Sanitary Plumbing and Drainage
  • Stormwater Plumbing and Drainage
  • Hydraulic Installation design and planning
  • Hydraulic inground services, including water, sewer inground water up to connection to the site trunk reticulation
  • Authority services connections
  • Rainwater reticulation systems including tanks, pumps, filtration and controls
  • Syphonic Roof Water Drainage
  • Trade Waste Plumbing and Drainage
  • Trade Waste treatment apparatus
  • Downpipes and roof outlets including connections
  • Testing & Commissioning plans
  • Penetrations and hanger plan
  • Hydraulic plant design and
  • Performance solutions.