NSW - Nepean Stage 2, Axis Plumbing

Nepean Hospital Stage 2

Axis Plumbing are proud to work alongside CPB Contractors after the completion of Stage 1, to deliver Nepean Hospital Stage 2.

Stage 2 includes a new building that will seamlessly connect to the Stage 1 tower (Building A) and include:

  • An Intensive Care Unit
  • Medical imaging services and nuclear medicine
  • An in-centre renal dialysis unit
  • A new paediatric inpatient unit
  • Education and training facilities
  • A new front of house and reception area

The hydraulic services package included:

  • Stormwater plumbing and drainage
  • Sanitary pluming and drainage
  • Domestic hot and cold water services
  • Natural gas reticulation service
  • Inground fire services
  • Supply and installation of sanitary fittings and fixtures
  • Hot water plant and equipment

BUDGET – $11.4 MILLION